March 13 to 15 2018, Pujiang line trial operation basic conditions expertise meeting was held successfully. The representatives of the municipal government, Shentong Group and Pujiang Line attended. After exchanged with staff, tested equipment on site and reviewed the documents, the experts gave a high appreciation of the construction and trial operation preparations, agreed that the basic conditions for the trial operation were met.

 

expertise pujiang line

CONTACT US

This block is broken or missing. You may be missing content or you might need to enable the original module.